• Deutsch
Internal Login

Open Access

  • Home
  • Search
  • Browse
  • Publish
  • FAQ

Refine

Author

  • Auel, C. (27)
  • Boes, R.M. (16)
  • Sumi, T. (9)
  • Albayrak, I. (8)
  • Hagemann, M. (3)
  • Kantoush, S.A. (3)
  • Kobayashi, S. (3)
  • Albaryak, I. (2)
  • Koshiba, T. (2)
  • Müller-Hagemann, M. (2)
+ more

Year of publication

  • 2021 (1)
  • 2020 (1)
  • 2018 (3)
  • 2017 (2)
  • 2016 (6)
  • 2015 (5)
  • 2014 (2)
  • 2013 (1)
  • 2012 (3)
  • 2011 (2)
+ more

Document Type

  • Article in Conference Proceedings (26)
  • Article (2)

Language

  • English (25)
  • German (3)

Has Fulltext

  • yes (28) (remove)

Is part of the Bibliography

  • no (28)

Institute

  • Bauingenieurwesen (BAU) (28)

28 search hits

  • 21 to 28
  • BibTeX
  • CSV
  • RIS
  • 10
  • 20
  • 50
  • 100

Sort by

  • Year
  • Year
  • Title
  • Title
  • Author
  • Author
Abrasion damage estimation of sediment bypass tunnels: Validation and comparison of two prediction models (2015)
Auel, C. ; Boes, R.M. ; Sumi, T.
Abrasion damage estimation of sediment bypass tunnels: Validation and comparison of two prediction models. Annuals of Disaster Prevention Research Institute 58B, Kyoto Univer-sity, Japan
Abrasion prediction at Mud Mountain sediment bypass tunnel (2017)
Auel, C. ; Thene, J.R. ; Müller-Hagemann, M. ; Albaryak, I. ; Boes, R.M.
A major drawback of sediment bypass tunnels is the potential for severe invert abrasion due to intense bedload sediment transport. This paper briefly describes the abrasion phenomena as well as the available models used to predict invert material loss. The application and calibration is demonstrated on the basis of the Mud Mountain sediment bypass tunnel, Washington, USA.
Effects of sediment supply by bypass tunnels on bed to-pography, grain size, and invertebrate habitat (2016)
Kobayashi, S. ; Auel, C. ; Sumi, T. ; Takemon, Y.
To understand the effects of sediment bypass on environmental recovery of the degraded channels below dams, bed topography and bed materials above and below dam reaches were surveyed by ground-based measurements and aerial photos using quadrocopter. Coarse bed materials such as boulders were more represented below than above the Koshibu dam, where the bypass tunnel had not been in operation yet. The coarse materials formed steps and protruded in the water column within riffles and runs, both of which can increase slow-flow areas, below the dam. On the other hand, sand, gravel, and cobbles were abundant below as much as above the Asahi dam, where the bypass tunnel had been operated for >17 years. The downstream environment in terms of bed topography and grain size seems to have almost been recovered for the Asahi dam. However, less representation of large cobbles and boulders below the dam suggested a possibility of a selective deposition of coarse materials at the upstream of the bypass tunnel inlet.
Sustainable reservoir management using sediment bypass tunnels (2012)
Auel, C. ; Boes, R.M.
Reservoir sedimentation is an increasing problem affecting the majority of reservoirs both in Switzerland and worldwide. As many dams are more than 50 years of age, this problem is becoming more and more serious nowadays. Res-ervoir sedimentation leads to various severe problems such as a decisive de-crease of the active reservoir volume leading to both loss of energy production and water available for water supply and irrigation. These problems will intensify in the near future, because sediment supply tends to increase due to climate change. Therefore, countermeasures have to be developed. They can be divided into the three main categories sediment yield reduction, sediment routing and sediment removal. This paper focuses on the sediment routing using sediment bypass tunnels. Sediment bypass tunnels are an effective means to decrease the reservoir sedimentation process. By routing the sediments around the reservoir into the tailwater, sediment accumulation is reduced significantly. However, the number of sediment bypass tunnels in the world is limited primarily due to high investment and maintenance costs. The main problem of all bypass tunnels is the invert abrasion due to high velocities in combination with high sediment transport. Three Swiss bypass tunnel examples suffering invert abrasion are presented in this paper. Furthermore, VAW started a research project to investigate the invert abrasion process by conducting hydraulic scale tests in the laboratory. The goal of this research project is to establish general design criteria for optimal flow con-ditions where both sediment depositions in the tunnel are avoided and the result-ing abrasion damages are kept at a minimum.
Sediment management in the Solis reservoir using a bypass tunnel (2010)
Auel, C. ; Berchtold, T. ; Boes, R.M.
The Solis reservoir is located in the Alps in Grisons, Switzerland and is operated by the electric power company of Zurich (ewz). Since its construction in 1986, high sediment input during flood events has led to major aggradations in the reservoir. Up to date, nearly half of the original reservoir volume has been filled with sediments from upstream mountain torrents. The deltaic deposition starts extending into the active water volume. Therefore, ewz plans a sediment bypass tunnel to flush the incoming bedload around the dam to the downstream reach. In a first step the reservoir level during flood events is lowered to the minimum operation level. The delta is subjected to free surface flow and the bedload is transported over the delta and deposited further downstream. This sediment relocation decreases the delta volume within the active storage. During further flood events, the incoming sediment is led to the bypass tunnel intake using a guiding structure and flushed through the tunnel. If the flood exceeds the capacity of the bypass tunnel, the surplus flow passes the tunnel intake towards the bottom outlets with the bedload still being flushed through the tunnel. A skimming wall located upstream from the tunnel intake prevents driftwood blocking by leading it to the reservoir front where it can be safely removed. Both the sediment relocation due to water level drawdown and the flushing through the bypass tunnel are investigated and optimized in a hydraulic model at the Laboratory of Hydraulics, Hydrology and Glaciology (VAW) of ETH Zurich. Additionally, the sediment relocation process in the model is compared with a relocation test in the prototype.
Sediment bypass tunnel design – review and outlook (2011)
Auel, C. ; Boes, R.M.
Reservoir sedimentation is increasingly affecting the majority of reservoirs all over the world. As many dams are more than 50 years of age, this problem is becoming more and more seriou403s nowadays. Reservoir sedimentation leads to various severe problems such as a decisive decrease of the active reservoir volume leading to both loss of energy production and water available for water supply and irrigation. These problems will intensify in the very next future, because sediment supply tends to increase due to climate change. Therefore coun-termeasures have to be developed. They can be divided into the three main categories sediment yield reduction, sediment routing and sediment removal. This paper focuses on sediment routing by means of sediment bypass tunnels. Sediment bypass tunnels are an effective measure to stop or at least decrease the reservoir sedimentation process. By routing the sediments around the reservoir into the tailwater in case of flood events sediment accumulation of both bed load and suspended load is reduced significantly. However, the number of sediment bypass tunnels in the world is limited primarily due to high investment and above all maintenance costs. The state-of-the-art design criteria of constructing bypass tunnels are summarized herein; major problems such as tunnel invert abrasion are discussed. The need for further research regarding sediment transport in bypass tunnels and invert abrasion is highlighted.
Sediment bypass tunnel design - hydraulic model tests (2011)
Auel, C. ; Boes, R.M.
Reservoir sedimentation, a serious problem affecting the majority of reservoirs worldwide, was not systematically accounted for in the past. After 50 years of operation, a constantly decreasing reservoir volume becomes currently a serious challenge for reservoir owners, against which countermeasures have to be developed. This research focuses on sediment routing using a bypass tunnel to convey sediments past a dam. By transporting sediments into the tailwater past a dam, their accumulation in the reservoir is reduced significantly. However, the global number of sediment bypass tunnels is limited primarily due to high investment and maintenance cost. The main problem of all bypass tunnels is the massive invert abrasion due to high flow velocities combined with high sediment transport rates. Therefore, VAW started two research projects to counter this problem. The main goal of the first project Layout and design of sediment bypass tunnels is to investigate the invert abrasion process by conducting hydraulic laboratory tests and to establish general design criteria for optimal flow conditions in which both sediment depositions in the tunnel are avoided and the resulting abrasion damages are kept at a minimum. The second project Optimizing hydroabrasive-resistant materials at sediment bypass tunnels and hydraulic structures investigates the hydraulic resistance of different tunnel invert materials, such as high performance concrete or cast basalt plates in prototype tests at the Solis bypass tunnel. The sediment transport measurement technique used in this project was optimized during preliminary model tests.
Field Investigation on Hydroabrasion in High-Speed Sediment-Laden Flows at Sediment Bypass Tunnels (2020)
Müller-Hagemann, M. ; Albayrak, I ; Auel, C ; Boes, RM
Wear due to sediment particles in fluid flows, also termed hydroabrasion’ or simply ‘abrasion’, is an omnipresent issue at hydraulic structures as well as in bedrock rivers. However, interactions between flow field, particle motion, channel topography, material properties and abrasion have rarely been investigated on a prototype scale, leaving many open questions as to their quantitative interrelations. Therefore, we investigated hydroabrasion in a multi‐year field study at two Swiss Sediment Bypass Tunnels (SBTs). Abrasion depths of various invert materials, hydraulics and sediment transport conditions were determined and used to compute the abrasion coefficients kv of different abrasion models for high‐strength concrete and granite. The results reveal that these models are useful to estimate spatially averaged abrasion rates. The kv‐value is about one order of magnitude higher for granite than for high‐strength concrete, hence, using material‐specific abrasion coefficients enhances the prediction accuracy. Three‐dimensional flow structures, i.e., secondary currents occurring both, in the straight and curved sections of the tunnels cause incision channels, while also longitudinally undulating abrasion patterns were observed. Furthermore, hydroabrasion concentrated along joints and protruding edges. The maximum abrasion depths were roughly twice the mean abrasion depths, irrespective of hydraulics, sediment transport conditions and invert material.
  • 21 to 28

OPUS4 Logo

  • Contact
  • Imprint
  • Sitelinks