The Solis dam was built in 1986 by the Electric Power Company of Zurich (ewz). Ever since the construction, large amounts of sediments accumulated in the reservoir and led to severe sediment aggradation. As a consequence, the storage volume was reduced by about 50% till 2012 causing loss of energy production. Additionally, in the near future sediments may have caused severe damage at the dam due to blockage of the bottom outlets. Therefore, in 2011 and 2012 a sediment bypass tunnel was realized in order to redirect the incoming sediments into the tailwater to inhibit sediment aggradation. Since its inauguration, the tunnel was operated four times including a 100-year flood event in August 2014. First operational experiences are described herein.
Schallimmissionsschutz
(2015)
Schallimmissionsschutz
(2015)
The derivation of an abrasion prediction model for concrete hydraulic structures valid in supercritical flows is presented herein. The state of the art saltation-abrasion model from Sklar and Dietrich (2004) is modified using the findings of a recent research pro-ject on the design and layout of sediment bypass tunnels. The model correlates the im-pacting parameters with the invert material properties by an abrasion coefficient kv. The value of this coefficient is verified by a similarity analysis to bedrock abrasion in river systems applying a correlation between the abrasion rate and the bed material strength. A sensitivity analysis reveals that the saltation-abrasion model is highly dependent on an adequate estimation of kv. However, as a first order estimate the proposed model en-ables the practical engineer to estimate abrasion at hydraulic structures prone to super-critical flows.