Reservoir sedimentation is increasingly affecting the majority of reservoirs all over the world. As many dams are more than 50 years of age, this problem is becoming more and more seriou403s nowadays. Reservoir sedimentation leads to various severe problems such as a decisive decrease of the active reservoir volume leading to both loss of energy production and water available for water supply and irrigation. These problems will intensify in the very next future, because sediment supply tends to increase due to climate change. Therefore coun-termeasures have to be developed. They can be divided into the three main categories sediment yield reduction, sediment routing and sediment removal. This paper focuses on sediment routing by means of sediment bypass tunnels. Sediment bypass tunnels are an effective measure to stop or at least decrease the reservoir sedimentation process. By routing the sediments around the reservoir into the tailwater in case of flood events sediment accumulation of both bed load and suspended load is reduced significantly. However, the number of sediment bypass tunnels in the world is limited primarily due to high investment and above all maintenance costs. The state-of-the-art design criteria of constructing bypass tunnels are summarized herein; major problems such as tunnel invert abrasion are discussed. The need for further research regarding sediment transport in bypass tunnels and invert abrasion is highlighted.
Reservoir sedimentation, a serious problem affecting the majority of reservoirs worldwide, was not systematically accounted for in the past. After 50 years of operation, a constantly decreasing reservoir volume becomes currently a serious challenge for reservoir owners, against which countermeasures have to be developed. This research focuses on sediment routing using a bypass tunnel to convey sediments past a dam.
By transporting sediments into the tailwater past a dam, their accumulation in the reservoir is reduced significantly. However, the global number of sediment bypass tunnels is limited primarily due to high investment and maintenance cost. The main problem of all bypass tunnels is the massive invert abrasion due to high flow velocities combined with high sediment transport rates. Therefore, VAW started two research projects to counter this problem. The main goal of the first project Layout and design of sediment bypass tunnels is to investigate the invert abrasion process by conducting hydraulic laboratory tests and to establish general design criteria for optimal flow conditions in which both sediment depositions in the tunnel are avoided and the resulting abrasion damages are kept at a minimum. The second project Optimizing hydroabrasive-resistant materials at sediment bypass tunnels and hydraulic structures investigates the hydraulic resistance of different tunnel invert materials, such as high performance concrete or cast basalt plates in prototype tests at the Solis bypass tunnel. The sediment transport measurement technique used in this project was optimized during preliminary model tests.