Solis sediment bypass tunnel: First operation experiences

  • The Solis dam was built in 1986 by the Electric Power Company of Zurich (ewz). Ever since the construction, large amounts of sediments accumulated in the reservoir and led to severe sediment aggradation. As a consequence, the storage volume was reduced by about 50% till 2012 causing loss of energy production. Additionally, in the near future sediments may have caused severe damage at the dam due to blockage of the bottom outlets. Therefore, in 2011 and 2012 a sediment bypass tunnel was realized in order to redirect the incoming sediments into the tailwater to inhibit sediment aggradation. Since its inauguration, the tunnel was operated four times including a 100-year flood event in August 2014. First operational experiences are described herein.
Bitte benutzen Sie diese Referenz, um auf diese Ressource zu verweisen:
https://doi.org/10.25974/fhms-15153

Volltext Dateien herunterladen

Metadaten exportieren

Weitere Dienste

Metadaten
Verfasserangaben:C. Oertli, C. Auel
URN:urn:nbn:de:hbz:836-opus-151539
DOI:https://doi.org/10.25974/fhms-15153
Titel des übergeordneten Werkes (Englisch):Proc. 1st Int. Workshop on Sediment Bypass Tunnels, VAW Mitteilungen
Verlag:ETH Zurich
Dokumentart:Beitrag in einer Konferenzveröffentlichung
Sprache:Englisch
Datum der Veröffentlichung (online):22.08.2022
Jahr der Erstveröffentlichung:2015
Betreiber des Publikationsservers:FH Münster - University of Applied Sciences
Datum der Freischaltung:02.09.2022
Erste Seite:223
Letzte Seite:233
Fachbereiche:Bauingenieurwesen (BAU)
Publikationsliste:Auel, Christian
Lizenz (Deutsch):License LogoZweitveroeffentlichung